Applying For LESCO New Connection

Applying for Lesco New Connection was such a difficult process. But nowadays, you can easily apply from your home.

To apply for a new connection, you typically need to follow these general steps but keep in mind that the process may vary based on your location and the specific utility company.

Required Documents

You must have a National Identity Card and other supporting documents like ownership of the house or shop. If you are not the owner then an authority letter from the landlord you have to attach with documents.

LESCO Demand Notice Fee

The LESCO demand Notice fee for a new connection depends upon the category and your required electricity load. Residential and Commercial demand notice fees are different.

You can pay the fees with different cash payment methods through the bank, 1 Link Bank Transaction, Jazz Cash, and other mobile banking apps. 

The normally estimated fee for demand notice is:

  • In City areas: Rs-12660
  • In Rural areas: Rs-10830
LESCO New Connection

LESCO New Connection Procedure

Gather all the required Documents

LESCO New Connection

Now Download the Application form or Apply Online

Application Process

You can apply for LESCO Connection in two ways. You can apply online from the ENC official online portal for new connections.

  • Go to the ENC official website
  • Click on the Apply option
  • A new Connection Application Form will be opened
  • Now Fill in the options and select your Distribution company LESCO
  • Then Select your Sub-division
  • Now select the category type of Electricity Load you need
  • In the end, you have to enter the reference number of your neighbors if it already exists it’s optional.

Timeframe For Application Process

After completing the application process and submitting all the necessary documents you have to submit them nearest LESCO sub-division office.

The distribution company takes 15-20 days to verify your documents after receiving the application from the applicant. You have to provide an active phone number in any case of delay or issue in your application the distribution company can contact you.

Category Wise Steps

Here are some categories according to the loads:

Category OneCategory Two Category ThreeCategory FourCategory Five
Upto 15 KWAbove 15KW But Not Exceeding 70KWAbove 70 Kw But Not Exceeded 500KWAbove 500KW But Not Exceeded 5000KWAll Loads 66 KV and Above

LESCO New Connection Tracking

For your application tracking click on the Track Button to check the current status of your application:

You will be redirected to the next page on ENC now select the company enter the application tracking ID then click on submit.

LESCO New Connection Tracking

Change Meter or Change Load

Change Connection Name /Tariff /Load Application (Form Online)

Change Meter or Change Load

Sometimes people change their residence want to increase their power load or want to change their tariff.

If you want to change your connection name to another name or want to change a load of electricity for your residential or commercial use download the Application form or fill online.

The process is very easy:

First of all select your application type change of name, change of tariff, change of Load

For all Types of applications enter:

  1. Enter your reference number 
  2. NIC Number
  3. Phone Number

For Name Change the Application:

  1. Current Name and Father Name or Husband Name 
  2. New Name and Father Name, Husband Name

For Tariff and Load Change:

  1. Old Tarrif to New Tarrif
  2. Select Load Type or Change type of Load

Attachments Needed:

  • Attested CNIC Copy of Applicant
  • Applicant Electricity Bill Copy
  • Proof of Ownership

Read the terms and conditions carefully and all entered details properly before submitting the application.

Causes of Meter Replacements

There are some reasons to replace or change of meter like false meter readings, or an outdated, meter is dead.

If you are facing any other issue or problem in the meter you can apply to change the meter.

FAQS

How I can apply for LESCO New Connection?

You can visit your region’s LESCO office or visit the website for an online application form for a new connection.

How Much is the Demand Notice Fee For LESCO Connection?

It varies upon the areas and load of your connection nearly In City areas: Rs-12660
In Rural areas: Rs-10830.

Can I change the name of my existing meter?

Yes, you can change the name, load, and tariff of your current connection.

Conclusion:

Hope you will understand all the processes to apply for LESCO Bill New Connection, meter changing, connection name changing, Meter Load changing or changing of tariff.

All types of applications can be submitted online on the above-given links or download them and visit the sub-division office to submit application forms after filling them.